OpenContracts

Modern Methods of Construction Framework Agreement

Hyde Housing Association Limited Complete Contract award

Buyer
Hyde Housing Association Limited
Estimated value
£100,000,000 as published; Contracts Finder does not say whether VAT is included
Awarded value
£100,000,000 as published, VAT not stated; a framework counts once, not once per supplier
Procedure
Restricted procedure
Category
Works
CPV code
45223810 Prefabricated constructions
First published
23 Oct 2015
Last updated
23 Oct 2015
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Hyde has undertaken a comprehensive review of our approach to housing development, putting in place a forward looking and robust development programme aligned to Hyde’s 5 year Strategic plan. A critical part of its successful delivery is putting in place long term arrangements with a selected number of key partners, to further our ambitions in building innovative homes using Modern Method of Construction (MMC) systems. Hyde has a significant planned development programme, and it is anticipated that circa 1,500 units per annum could be delivered across the Group’s main geographical areas of operation (mainly London, the South Coast, and Kent) - of which Hyde aspire to develop up to 10% of our programme utilising an MMC system.There are five categories used by the Housing Corporation to classify an MMC construction system. Hyde are seeking bids from innovate providers with a demonstrable track record in delivering residential housing, using any of the MMC systems listed below, whilst also possessing the associated development management services:1.Off-site manufactured - volumetric•Three-dimensional units produced in a factory, fully fitted out before being transported to site and stacked onto prepared foundations to form dwellings.2.Off-site manufactured - panellised•flat panel units built in a factory and transported to site for assembly into a three-dimensional structure or to fit within an existing structure).3.Off-site manufactured - hybrid•Volumetric units integrated with panellised systems.4.Off-site manufactured - sub-assemblies and components•Larger components that can be incorporated into either conventionally built or MMC dwellings.5.Non-off-site manufactured MMC•Innovative methods of construction used on-site and the use of conventional components in an innovative way

Awards

SupplierValueDateStatus
Laing O'Rourke Construction Ltd, Mears Limited, F1 Modular Ltd, Mar City Plc framework £100,000,000 10 Aug 2015 Active

A framework award repeats the framework's whole value for each supplier given a place on it, so those values are not added up.

Notices

  1. 23 Oct 2015 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data