Minsmere RSPB: Access for all footpath & new bridge

Royal Society For The Protection Of Birds Active Tender amendment

Buyer
Royal Society For The Protection Of Birds
Procedure
Open procedure (below threshold)
Category
Works
CPV code
45000000 Construction work
First published
22 Mar 2022
Last updated
22 Mar 2022
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The aim of the project is to improve access to the Minsmere East Hide for visitors with impaired mobility. A fully accessible path will be constructed to connect the North Wall trail to the extended East Hide inside the existing sea defence. The path will create an aesthetically pleasing access route with carefully spaced bench seating with views over the adjacent Scrape. A ramp will be constructed to provide access from the North Wall, ensuring that the North Wall's function as a flood defence is unimpaired. A low-level path or boardwalk will then follow the line of the sea defence to the East Hide. This will involve creating a new bridge over the Scotts Hall Drain and meeting the apron of the hide so that wheelchair access is maintained.

The ramp from the North Wall will be created with granite-filled gabions and a surfaced path. The path from the base of the ramp has been specified similarly, but we would be keen to consider a boardwalk solution, preferably using recycled plastic boards for the decking and structure.

Details of how to apply in Tender document attached

Additional information: The Initial Tender submission shall comprise the following:
a. Brief synopsis of relevant experience of similar works and working on sensitive
sites
b. Outline of resources and timescales for mobilization and completion of works
c. Costs for the three main elements:
• Ramp
• Bridge
• Path
including information on prelims and how OHP will be dealt with.
The Contractor shall provide information on the approaches proposed to deliver the
sections of path and the bridge, alongside outline costings and timetables for their
delivery and the construction of the ramp from the North Wall, which must be to the
specification provided, since the North Wall is a Flood Defence Structure.
The final Contract following a Second Stage Tender is to be the NEC 3 Engineering and
Construction Short Contract with the Contract Data as detailed in Appendix 1 though
this may be varied in agreement with the selected contractor.