Mids - EcoSF3 Lot 4 - Church Wilne Fish Passage Phase 1 OBC

Defra Network eTendering Portal Complete Contract award

Buyer
Defra Network eTendering Portal
Awarded value
£79,941 as published, VAT not stated
Procedure
Call-off from a framework agreement
Category
Services
CPV code
71313000 Environmental engineering consultancy services
First published
27 Nov 2020
Last updated
27 Nov 2020
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The Environment Agency is reviewing options to remove or modify a weir at Church Wilne (NR SK 43800 31600) to improve fish passage and improve the natural function of the River Derwent. The weir is currently redundant operationally due to a new acoustic gauge recently constructed downstream. The weir is a 27m wide Flat V gauging weir with approximately 1m head drop at low flows.

This call off contract is to deliver Phase 1 of the works which will take the project through to Outline Business Case (OBC) completion. Phase 2 will then follow on from Phase 1 with a new call off contract to take the project through to detailed design and FBC completion. This includes the handover of all Phase 1 deliverables in accordance to the BIM Execution Plan to enable Phase 2 to commence.

The preferred option will need to be determined through a high level cost assessment of the existing short list of options with removal being the optimal fish passage solution. An outline design is to be produced of the preferred option.

The successful Contractor will be required to work alongside a construction contractor appointed by the EA for Early Supplier Engagement (ESE) that will assist with the costs assessment and buildability of the preferred option.

Awards

SupplierValueDateStatus
AECOM Ltd £79,941 25 Nov 2020 Active

Notices

  1. 27 Nov 2020 Contract award