Description
The purpose of the project is to construct a new laboratory facility in the Ramsden Workshop to house
the Microscope and Ion Accelerator for Materials Investigations team, their new equipment and existing
equipment to be moved by others from their existing facility in the Technology Building.
The nature of the work includes the strip out of existing ceilings, floor covering, fixtures and fittings, old
spray booth equipment, ducting and cowls, mechanical and electrical services. The demolition of a
concrete block walls & metal stud partitions. The strip out of toilet cubicles, sanitary ware and
associated pipework and services. The excavation and casting of new pad foundations. The trimming
of existing roof structure beams to allow the removal of part of the roof. The construction of new steel
mezzanine floor structure, penetrating through the new roof opening. The construction of new walls onto
the steel structure to form a new extension. New precast concrete floor and roof structure. The moving
of two windows from the front elevation to the side elevation, blocking up the existing openings. The
through coat rendering of the new structure and front and side elevation of the existing structure.
Installation of new automatic external doors. The removal and installation of new roof lights. The
insulating to falls and new roof covering of the existing and new roof. New roof outlets, rain water pipes,
parapet capping and flashing.
The construction of new partitions, doors, architraves, skirting’s and window board. Skimming of the
new walls. Plastering of existing brick and block walls. Installation of new ceilings
The installation of new power, data and lighting. The installation of new heating, ventilation and cooling
systems.
The redecoration of all areas. The installation of new barrier matting, carpet tiles, and vinyl. The
installation of new kitchen units, worktop and sink. The installation of new storage unit sliding doors and
internal racking. The installation of new laboratory benching and mobile under bench units. The
Project PS2015-013 MIAMI-2 Laboratory Construction in Ramsden Workshop
October 2015
installation of new external and internal door swipe card access. The installation of a steel box structure
around the delivery opening. The installation of a new shop front frame and aluminium panels to seal
the delivery opening.
Additional information: Please apply for the tender through our In Tend system https://in-tendhost.co.uk/universityofhuddersfield/aspx/Home
Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/universityofhuddersfield/aspx/
Notices
- 27 Oct 2015 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.