Medical Gas Systems Upgrade- Main Theatres

Kettering General Hospital Active Tender notice

Buyer
Kettering General Hospital
Estimated value
£50,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Restricted procedure
Category
Works
CPV code
45000000 Construction work
First published
11 Nov 2016
Last updated
11 Nov 2016
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Kettering General Hospital has a requirement to appoint a contractor who will be responsible for Project Managing, supplying, installing, commissioning and co-ordinating the installation of a HTM 02-01 compliant medical gas systems that supply Theatres 1-6. Phase 1: The contractor shall provide a complete, fully operational medical gas distribution system to Theatres 4, 5 & 6, system to include all pipe work, valves, terminal units, retractable pendants, interconnecting signal wiring as detailed on the tender drawings.

Phase 2: The contractor shall provide a complete, fully operational medical gas distribution system to Theatres 2 & 3, note scope of works within the existing UCV theatres limited to that detailed on the tender drawings. To be completed by 31st January 2017.

Phase 3: The contractor shall provide a complete, fully operational medical gas distribution system to Theatre 1, note scope of works within the existing UCV theatres limited to that detailed on the tender drawings.

There will be some pipework modifications required in the roof plant room Agss Plant supply to Theatres 1 & 2 that will be covered by a contingency sum. All expressions of interest must be made through our E-tendering portal www.supplying2nhs.org where all tender documents may be viewed.