OpenContracts

Mare Harbour Ro Ro Facility Upgrade and Refurbishment, Falkland Islands

Ministry of Defence Complete Contract award

Buyer
Ministry of Defence
Estimated value
£19,136,917 as published; Contracts Finder does not say whether VAT is included
Awarded value
£19,136,917 as published, VAT not stated
Procedure
Restricted procedure
Category
Works
CPV code
45000000 Construction work
First published
25 Apr 2016
Last updated
25 Apr 2016
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

To undertake all design and build tasks associated with upgrade and refurbishment of the Mare Harbour Ro-Ro Facility for continued use by the Falklands Island Re-Supply (FIRS) Point Class vessel detailed below:

• To provide Mare Harbour Falkland Islands with a RO-RO facility suitable to cater for berthing, mooring and offloading of the FIRS Point Class vessels.

• To provide Mare Harbour Falkland Islands with a facility that is capable of supporting Small Boat Operations.

In order to meet these Requirements, the Works to be executed under this Contract shall include, but not be limited to, the design, construction, installation, testing, commissioning and remedying of defects of the following items:

Works including, amongst other requirements:

• Provision of a quay structure to act as a berthing face for the safe berthing of the FIRS Point Class RO-RO vessels
• Provision of supporting quay structures for mooring points to enable safe mooring
• Provision of pedestrian access gangways between the existing T-head jetty, the mooring points and the berthing face
• Provision of Fendering and mooring equipment, and safety equipment
• Minor repair to the quay face at the stern ramp for the RO-RO
• Cathodic protection to all existing sheet piled structures (including the T-head jetty), where these are retained for use in the facility
• Provision of a new small boats jetty comprising a pontoon on piled moorings and a linkspan, to support small boat operations
• Associated M&E services
• Demolition and disposal of existing structures where these are not re-used

The design must consider the significant logistical and environmental constraints which are present at operational ports. The requirement is for a 25 year design life for all elements of this project. All designs are to comply with relevant EU, UK and FI legislation.

Awards

SupplierValueDateStatus
Volkerstevin Ltd £19,136,917 22 Mar 2016 Active

Notices

  1. 25 Apr 2016 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data