# Manchester International Airport Phase 2 - Platform Civils

Kier Transportation - CP7 NWC · Open for tenders · Tender notice

- Buyer: Kier Transportation - CP7 NWC
- Tender deadline: 4 December 2026, 17:00
- Estimated value: £2,500,000 (VAT not stated)
- Category: Works
- CPV code: 45232452 Drainage works
- First published: 23 November 2026
- Last updated: 23 November 2026
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
      
      The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry.  This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
       
      A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
           
      The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.
      
      The works comprise the construction and completion of the platform civils work at Manchester Airport Station.
      •	Platform demolition
      •	Asset recoveries
      •	Track walkway/crossings
      •	UTX
      •	Troughing
      •	Riser wall foundations
      •	New riser walls (blockwork and PCC)
      •	Copers (including realignment)
      •	Tactile paving
      •	Drainage (ACO's and carrier)
      •	Ducting
      •	Equipment foundations (in-situ and PCC)
      •	Waiting shelter foundations
      •	Platform furniture
      •	SME works (end of platform ramps)
      •	Fencing/Gate works
      •	Block paving/surfacing
      •	Associated reinstatement works

## Notices

- 23 Nov 2026: Tender notice https://www.contractsfinder.service.gov.uk/Notice/0211da5c-4889-4c4f-98f6-00dc7cc1b7c8

---