M1 J10-13 Dynamic Hard Shoulder Upgrade  
Work Package: Power Planing
How to Apply:
Please email  the below address:
[email removed]
Subcontracts must hold construction line Gold accreditation or equivilant to be considered for these works.

Outline Scope 
The above scheme will require power planning of concrete areas to facilitate the upgrade of the central 
reservation.  
Required planed troughs will vary from 0.5m to 2.2m width with varying depths (0.05-0.2m), with 
90-95% of all planed materials being concrete.  
The Subcontract Works are to be executed as part of the Main Contract Works set out below;  
Description / 
Overall 
Scope of 
Works 

 

The existing central reserve Vehicle Restraint System (VRS) is being upgraded along the section of 
motorway from Junction 10 to Junction 13 as part of the Dynamic Hard Shoulder (DHS) safety 
enhancement scheme.  

 

The barrier upgrade is to be a Rigid Concrete Barrier system that will be slip-formed in-situ or pre-cast. 
The in-situ barrier will be Davidsons Concrete Barrier (DCB). The Pre-cast barrier will be Deltabloc 
Barriers.  At bifurcation locations either precast Delta bloc DB 80E barriers or precast DB 80AS-E will be 
used. As part of the central reservation upgrades works - the drainage system where required will also 
be upgraded - mainly between J11a and J12. 

 

In addition to the central reserve barrier upgrade there are 11no places of relative safety (PRS) to 
constructed, 5no on NB carriageway and 6no on SB carriageway. The PRS will compromise of localised 
widening by either re-grading the earthworks or by retentions solutions such as sheet pilling or precast 
concrete wall.  

Main 
Contract 
Period 

The contract programme is defined by the following key dates: 
The start of works date is 11th September 2023 
The open for traffic date is 31st July 2025

## Notices

- 10 Oct 2023: Tender notice https://www.contractsfinder.service.gov.uk/Notice/66c9fe20-5ff3-41e5-b3fd-245026271936

---
Page: https://opencontracts.uk/contract/m1-j10-13-dhs-power-planing-f213844b-919d-4091-9a97-59f768e34df9
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.