{
  "ocid": "ocds-h6vhtk-066c43",
  "slug": "london-gateway-second-rail-terminal-phase-2-066c43",
  "rules": "Procurement Act 2023",
  "vat_stated": true,
  "title": "London Gateway - Second Rail Terminal Phase 2",
  "display_title": "London Gateway - Second Rail Terminal Phase 2",
  "url": "https://opencontracts.uk/contract/london-gateway-second-rail-terminal-phase-2-066c43",
  "json_url": "https://opencontracts.uk/contract/london-gateway-second-rail-terminal-phase-2-066c43.json",
  "buyer": {
    "name": "LONDON GATEWAY PORT LIMITED",
    "display_name": "London Gateway Port Limited",
    "slug": "london-gateway-port-limited",
    "url": "https://opencontracts.uk/buyer/london-gateway-port-limited",
    "json_url": "https://opencontracts.uk/buyer/london-gateway-port-limited.json"
  },
  "status": "complete",
  "open_for_tenders": false,
  "stage": "Contract award notice",
  "method": "Competitive flexible procedure",
  "category": "works",
  "cpv_code": "45234100",
  "cpv_description": "Railway construction works",
  "description": "Description\nDP World is undertaking the expansion of its London Gateway Port facility at Stanford le\nHope, through the development of a new second rail terminal located to the west of the\nexisting eastern operational rail facility. This investment will significantly increase the\nport's rail freight capacity, improve operational resilience, and support the continued\ngrowth of DP Worlds sustainable, low carbon logistics solutions.\nThis expansion represents a strategic enhancement of the port's intermodal capability,\nenabling faster, more efficient movement of goods across the UK and supporting national\nobjectives for greener freight transport. The new terminal will play a key role in\naccommodating future demand and maintaining London Gateway's position as a world\nclass logistics and supply chain hub.\nThe Scope of Works covered under this tender include, but are not limited to, the following\nkey elements:\nPermanent Way Works\nConstruction of new railway infrastructure to serve the second terminal including plain line\ntrack, and associated components in a phase installation sequence delivering five new\nsidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of\n21 new switches and crossings (S&C) required to connect the new terminal to the existing\nrail network corridor as well as providing more route paths for trains entering and exiting\nthe existing eastern rail terminal.\nCivil Engineering Works\nInstallation of a circa 850m long reinforced concrete crane rail beam with pre-cast\nconcrete pile foundations and its associated mechanical chambers to allow Rail Mounted\nGantry Crane (RMGC) operations within the new terminal. Earthworks, formation\npreparation, track drainage and utility diversions necessary to support the new terminal\ninfrastructure. Construction of numerous ancillary civils foundation bases, walkways,\ncable routes and under track crossings for the new signalling, telecommunications and\nelectrical plant equipment, shunters cabin and REB building.\nTelecommunications Works\nInstallation of new and relocation of existing Operational Telecoms and SiSS systems\nassets including CCTV cameras, signal post and point zone telephones and the shunters\npanel concentrator.\nSignaling Works\nProvision of new and relocation of existing signaling assets, including lineside equipment,\ncontrol system modifications in the form of new Shunters Cabin housing an updated\ncontrol panel to operate both rail terminals, and associated REB for the signaling system\ninterlocking. These assets will be constructed in a staged delivery to align with the\npermanent way phasing, to ensure full operational compatibility. Installation of new\nsignaling track circuits to both the western and eastern terminals will enable operation of\nboth facilities from the one new control panel. Testing, commissioning and integration of\nall new rail systems with existing operational infrastructure as well as update to the\nUpminster IECC workstation screens.\nElectrical and Plant Works\nNew power supplies to the various disciplines line side equipment, shunters cabin and\nREB, as well as new points heating assets for both the western and existing eastern rail\nterminal S&C units.\nInterfaces and Integration\nManagement of all interfaces with existing rail infrastructure, port operations, utilities, and\nthird party stakeholders. Development of staging plans to minimise operational disruption\nand ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction.\nProject Goals\nUpon completion, the new rail terminal will provide; increased rail served capacity for\ncontainerised freight, enhanced operational flexibility and resilience, deliver infrastructure\ncapable of supporting robotic next generation RMGC equipment and improved efficiency\nas well as reduce the ports carbon impact through expanded rail freight capability.",
  "currency": "GBP",
  "estimated_value": "15000000.00",
  "estimated_value_gross": "18000000.00",
  "awarded_value": "30999487.00",
  "awarded_currency": "GBP",
  "awarded_is_gross": false,
  "is_framework": false,
  "tender_deadline": null,
  "first_published": "2026-03-17T13:40:13+00:00",
  "last_updated": "2026-11-23T15:14:26+00:00",
  "lots": [
    {
      "id": "1",
      "title": null,
      "status": "complete",
      "value": "15000000.00",
      "value_gross": "18000000.00",
      "currency": "GBP",
      "source": "find_a_tender",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/110675-2026",
      "retrieved_at": "2026-11-23T17:40:32.321535+00:00"
    }
  ],
  "awards": [
    {
      "award_id": "1",
      "status": "pending",
      "date": "2026-11-23T00:00:00+00:00",
      "value": "30999487.00",
      "value_is_gross": false,
      "currency": "GBP",
      "is_framework": false,
      "shared": false,
      "counted": true,
      "lots": [
        "1"
      ],
      "suppliers": [
        {
          "name": "TRACKWORK LIMITED",
          "display_name": "Trackwork Limited",
          "slug": "trackworks-ltd",
          "url": "https://opencontracts.uk/supplier/trackworks-ltd",
          "json_url": "https://opencontracts.uk/supplier/trackworks-ltd.json"
        }
      ],
      "source": "find_a_tender",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/110675-2026",
      "retrieved_at": "2026-11-23T17:40:32.321535+00:00"
    }
  ],
  "contracts": [],
  "notices": [
    {
      "notice_id": "024069-2026",
      "label": "Tender notice",
      "date": "2026-03-17T13:40:13+00:00",
      "url": "https://www.find-tender.service.gov.uk/Notice/024069-2026",
      "source": "find_a_tender",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/024069-2026",
      "retrieved_at": "2026-11-18T17:58:48.111577+00:00"
    },
    {
      "notice_id": "110675-2026",
      "label": "Contract award notice",
      "date": "2026-11-23T15:14:26+00:00",
      "url": "https://www.find-tender.service.gov.uk/Notice/110675-2026",
      "source": "find_a_tender",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/110675-2026",
      "retrieved_at": "2026-11-23T17:40:32.321535+00:00"
    }
  ],
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.",
  "source": "find_a_tender",
  "source_url": "https://www.find-tender.service.gov.uk/Notice/110675-2026",
  "retrieved_at": "2026-11-23T17:40:32.321535+00:00",
  "provenance": {
    "source": "find_a_tender",
    "source_url": "https://www.find-tender.service.gov.uk/Notice/110675-2026",
    "retrieved_at": "2026-11-23T17:40:32.321535+00:00"
  }
}