Legacy Concrete Roads Reconstruction Framework
National Highways Limited Complete Contract award
- Buyer
- National Highways Limited
- Estimated value
- £968,000,000 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £968,000,000 as published, VAT not stated; a framework counts once, not once per supplier
- Procedure
- Open procedure (above threshold)
- Category
- Works
- CPV code
45233000Construction, foundation and surface works for highways, roads- First published
- 5 Mar 2024
- Last updated
- 3 Mar 2026
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes:
- design and subsequent construction services for:
- demolition of existing concrete pavements,
- reconstruction of pavements (including new pavement furniture and markings)
- design and delivery of associated temporary traffic management solutions,
- when instructed:
- involvement in optioneering,
- design and construction of alterations to those legacy assets which interface with the replacement pavements' designs, which may include sub-surface drainage, street furniture and its foundations and signage,
- design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings),
- performing principal designer and principal contractor duties as defined under the "Construction
(Design and Management) Regulations 2015" ("CDM Regulations 2015"),
- carbon capture recording and reporting,
- recovery, recycling and reuse of arisings during the delivery of a scheme,
- engagement with all identified stakeholders, and
- identification, recording and realisation of programme efficiencies.
The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4.
This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations.
From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| John Graham Construction Limited, Kier Transportation Limited, John Sisk and Son Ltd framework | £968,000,000 | 9 Feb 2026 | Active |
A framework award repeats the framework's whole value for each supplier given a place on it, so those values are not added up.
Notices
- 5 Mar 2024 Planned procurement
- 22 Jan 2025 Tender notice
- 3 Mar 2026 Contract award
Contracts Finder holds the official notices, with their documents and contact details.