# Instrumentation and Monitoring

Sizewell C Limited · Active · Tender notice

- Buyer: Sizewell C Limited
- Estimated value: £40,000,000 (VAT not stated)
- Category: Works
- CPV code: 31682210 Instrumentation and control equipment
- First published: 29 April 2026
- Last updated: 29 April 2026
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

The scope of works for this package includes:
      
      •	Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems
      •	Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work does not include provision of the database)
      •	All instrumentation is expected to be battery or solar powered
      •	Compliance with relevant industry standards and regulatory requirements
      •	Joint Ventures/Alliances will be considered
      
      Packages of work area as follows:
      InSAR Satellite 
      •	Provision of historical data to cover the area of Sizewell B and Sizewell C.
      •	Provision of multi-directional coverage and analysis of the Sizewell B and Sizewell C area until 2036 (period maybe extended).
      Unit 1 and 2 Plastic Wall Monitoring
      •	Commence September 2026, end June 2027
      •	Drilling of approx. 200nr installation boreholes to a depth of 55m below ground level
      •	Installation of IPI, IPIX, VWP and GNSS positional location monitoring
      
      Unit 1 and 2 Retaining Walls
      •	Commence September 2026, end January 2028.
      •	Installation in void formers at 200nr locations
      •	Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring
      
      Shafts and Tunnels
      •	Commence May 2027, end December 2027.
      •	Installation in void formers at 50nr locations
      •	Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring
      
      Backfill Specification
      •	Commence September 2027, end January 2029.
      •	Installation under main nuclear islands
      •	Installation of horizontal Inclinometers/SAA, hydraulic settlement cells and extensometers
      
      Provision of Maintenance Team
      •	Commence September 2026, end December 2036 (maybe extended.
      •	Provision of maintenance services to ensure operation of installed instrumentation, maintaining solar and battery powered equipment.
      •	Undertaking manual monitoring where necessary

Additional information: It will be beneficial for you to describe your business as mush as possible and highlight where you can help us to achieve our values described above

## Notices

- 29 Apr 2026: Tender notice https://www.contractsfinder.service.gov.uk/Notice/17bb5818-d6ec-4a70-96f9-1dab83a6538d

---
Page: https://opencontracts.uk/contract/instrumentation-and-monitoring-c1f0f7c9-3cd4-4454-be08-20030aa4fa1b
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.