OpenContracts

Infrared Cameras

University Of Salford(the) Active Tender notice

Buyer
University Of Salford(the)
Estimated value
£80,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Open procedure (below threshold)
Category
Services
CPV code
38651000 Cameras
First published
20 Aug 2020
Last updated
20 Aug 2020
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energy-house ). A video of the project can be found here https://www.youtube.com/watch?v=oP3bsXeQKYU
EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features:
• 2 large chambers capable of having 2 family homes built in each one (4 homes in total)
• Temperature controlled to within 0.5 °C from -20°C to +40 °C
• Wind, rain, solar radiation and snow can be generated
• These conditions provide testing facilities for housing covering 95% of the global population.
The Energy House 2 Project has a requirement to measure the surface temperature of buildings in a chamber environment.

Please go to our InTend Portal for full tender documentation: https://in-tendhost.co.uk/salford/aspx/Home

Additional information: All correspondence must be made via our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home

Notices

  1. 20 Aug 2020 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data