OpenContracts

Greenwich Power Station - Replacement Gas Turbine

Transport for London Planning Planned procurement

Buyer
Transport for London
Estimated value
£7,500,000 as published; Contracts Finder does not say whether VAT is included
CPV code
42112000 Turbine installations
First published
1 Sep 2021
Last updated
1 Sep 2021
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

1) Dismantle, removal and disposal of the complete GT/A2 asset including gas turbine, power turbine, alternator and all associated plant/equipment.

2) The design, supply, installation and commissioning of a dual-fuel capable (natural gas and liquid gas oil) open cycle gas turbine package rated to deliver nominal 14MW of power, to fit into the available footprint following the removal of the GT/A2 asset. (approximate space available 22.6m x 7.58m = 171m²).

Notices

  1. 1 Sep 2021 Planned procurement

Contracts Finder holds the official notices, with their documents and contact details.

Data