OpenContracts

GMCA 2171 Strategic Environmental Assessment

Greater Manchester Combined Authority Planning Preliminary market engagement notice

Buyer
Greater Manchester Combined Authority
Estimated value
£100,000 excluding VAT; £120,000 including VAT
Category
Services
CPV code
90711400 Environmental Impact Assessment (EIA) services other than for construction
First published
5 Nov 2026
Last updated
5 Nov 2026
Legal basis
Procurement Act 2023

Description

Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan
The Greater Manchester Combined Authority is undertaking an expression of interest for the following:
Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP).
The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed working in partnership with local authorities and a specialist third-party and will be produced in line with the Town and Country Planning (Local Planning)(England) Regulations 2026 under the new plan-making system. The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027.
The proposed commission comprises the following activities:
- Strategic Environmental Assessment for Greater Manchester Joint Minerals and Waste Plan
- Preparation and consultation on the scope and level of detail of the SEA Environmental Report. This will run at the same time as the consultation on the proposed minerals and waste plan content and evidence.
- Preparation and consultation on the proposed SEA Environmental Report. This will run at the same time as the as consultation on the proposed minerals and waste plan.
- Review and finalise SEA Environmental Report prior to ‘Gateway 3’.

Notices

  1. 5 Nov 2026 Preliminary market engagement notice 105209-2026

Find a Tender holds the official notices, with their documents and contact details.

Data