OpenContracts

GB-Portsmouth: Support to Nikon Metris HT225 Real Time Radiographic and computerised Tomography

Ministry of Defence, C&C, C&C Complete Contract award

Buyer
Ministry of Defence, C&C, C&C
Estimated value
£90,800 as published; Contracts Finder does not say whether VAT is included
Awarded value
£90,800 as published, VAT not stated
Procedure
Open procedure
Category
Services
CPV code
50421200 Repair and maintenance services of X-ray equipment
First published
2 Jun 2015
Last updated
2 Jun 2015
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

To provide preventative maintenance, certification and support to Nikon Metris HT225 Real Time Radiographic and computerised Tomography X Ray Imaging system for 5 years for 1710 Naval Air Squadron.

Additional specification detail is provided at 12.

Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement, and the contract will be awarded on the basis of the most economically advantageous tender.

Statement of Requirement for the Support of the 1710 NAS Nikon Metris HT225 RTR and CT X-Ray Imaging System.

1. Introduction

The Nikon Metris HT225 is a Real Time and Computerised Tomography Radiographic facility in use by 1710 NAS for the inspection of components to establish their material state prior to failure investigation processes. The facility ensures that evidence of failure is captured prior to any tear down. This facility is required on a 24/7 basis and it is essential that it is regularly maintained and supported with a breakdown capability.

2. Specification

2.1 The system shall be subject to 6 monthly preventive maintenance and critical radiation survey inspections. Radiation protection certification shall be provided.

2.2 All parts necessary to ensure full operation of the equipment shall be included within the contract.

2.3 Software upgrades shall only be provided and installed on agreement with the equipment owner.

2.4 In case of breakdown, a qualified Nikon engineer shall be available on site within 48 hours.

2.5 Travel and labour costs shall be included within the support contract.

Awards

SupplierValueDateStatus
X-Tek Systems Limited £90,800 1 Jun 2015 Active

Notices

  1. 2 Jun 2015 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data