GB-Poole: DH366 Alderney Hospital Replacement Boiler Plant Jersey Ward
Dorset HealthCare University NHS Foundation Trust Active Tender notice
- Buyer
- Dorset HealthCare University NHS Foundation Trust
- Estimated value
- £100,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Open procedure
- Category
- Works
- CPV code
71334000Mechanical and electrical engineering services- First published
- 17 May 2016
- Last updated
- 17 May 2016
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
Electrical isolation of the boilerplant and strip out of its electrical services back to the
control panel
Isolation of the boiler gas supply
Summer strip out of the existing boilerplant including most of the LPHW services in the
plantroom, local gas supply pipework and the boiler flues and flue header
Installation of temporary power supplies for the two hot water generators, the HWS
secondary pump and the associated instrumentation and the new gas safety shut-off
valve
Installation of a circular sheet steel protector to the 152 x 152 building column
Extension of the boiler concrete base
Installation of a stainless steel flashing plate for the boiler flues replacing the wired glass
panel above the plantroom doors
Installation of a back inlet gully immediately outside the plantroom with 100mm drain pipe
to the existing manhole and 50mm metal sleeve through the outside wall
Installation of an extract grille and frame over the opening in the chimney stack left when
the flue header is removed
Preparation of gas supply pipework
Shutdown of the gas supply and installation of a safety shut-off valve and isolating valves
Installation of the new boilerplant with its flues, LPHW pipework, gas pipework,
condensate and general drainage pipework
Installation of an expansion vessel and pressurisation unit with mains cold water supply,
system feed and drain pipework
Installation of a mains cold water supply for flushing of the Adey magnetic filter
Thermal insulation of all new and modified LPHW and mains cold water pipework
Remedial thermal insulation to any existing insulation cut back or damaged by the works
Installation of a new plantroom power supply isolator, plantroom distribution board,
plantroom lighting, emergency lighting and double switched socket outlet all with
galvanised steel cable containment
Installation of a new plant control panel for the boilerplant and the existing HWS plant
Installation of field wiring for the new boilerplant
esting and commissioning
Reconnection of the field wiring to the HWS plant and testing
Clearing site
Provision of as fitted drawings and an operation and an operation and maintenance
manual
Demonstration of the new boiler plant and services to the Trust’s Estates department