G4_1_HCC_051 A32 Farringdon Flood Alleviation Scheme Phase 2b
Hampshire County Council Complete Contract award
- Buyer
- Hampshire County Council
- Estimated value
- £197,705 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £197,705 as published, VAT not stated
- Procedure
- Call-off from a framework agreement
- Category
- Works
- CPV code
45230000Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork- First published
- 9 Jun 2023
- Last updated
- 9 Jun 2023
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020).
Install various sections of a new surface water drainage network, comprising pipes, manholes, ditches and headwalls and associated works. The purpose of the project is to provide a route for groundwater to flow during groundwater flood events, which occur in the winter approximately every 3-5 years.
Works also include:
• Investigative works such as trial holes, where annotated on the drawings
• Traffic management (see Section 4 of Scope)
• Reinstatement of boundary features (hedgerows, fencing)
• Root protection measures
• Reinstatement of road construction / private accesses as specified
• Reinstatement of grass as specified
• Works will be conducted in coordination with simultaneous works carried out by a third-party contractor.
The third-party works will include:
• Installing pipework where it crosses the A32 Road resurfacing
• Road resurfacing
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Rocon Contractors LTD | £197,705 | 16 May 2023 | Active |
Notices
- 9 Jun 2023 Contract award
Contracts Finder holds the official notices, with their documents and contact details.