OpenContracts

Forestry England - Whinlatter Hydroelectric Power Scheme

Forestry Commission Active Tender notice

Buyer
Forestry Commission
Procedure
Open procedure
Category
Goods
CPV code
31000000 Electrical machinery, apparatus, equipment and consumables; lighting
First published
11 Apr 2020
Last updated
11 Apr 2020
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer.
An outline scheme has been granted planning permission, consisting of an inlet structure, penstock, turbine house and outlet, with electrical connections into both the Whinlatter Visitor Centre and into Thornthwaite, for export to the National Grid. Detailed design is currently in progress for the overall scheme with the turbine specification and requirements set out below.
This tender is for the award of a Contract for the design, manufacture, supply, installation, commissioning and the planned and reactive maintenance of a suitable turbine. The maintenance service will be for an initial period of four years post commissioning.

Notices

  1. 11 Apr 2020 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data