Fit Out - WP12.2.2 - WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork - Old Oak Common (S4) Station
Balfour Beatty VINCI Systra JV Complete Contract award
- Buyer
- Balfour Beatty VINCI Systra JV
- Estimated value
- £2,500,000 as published; Contracts Finder does not say whether VAT is included
- Category
- Works
- CPV code
45262420Structural steel erection work for structures- First published
- 30 Jan 2024
- Last updated
- 15 Jan 2025
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelworks
Scope of work
WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork Envelope consists of the design for construction and manufacture, supply, installation, and assurance of structural steelworks to the accommodation blocks, Lift & Escalator Electrical Room (LEER) on HS2 platform level, central core on concourse level, 'T' shaped lower-level escalator supports on HS2 platform, and 'V' shaped intermediate level escalator supports. The scope of works comprises the following:
Levels: HS2 Station Platform Level & Concourse Level
Elements: Structural steel
Design Development: Prepare the design for construction and manufacture, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements, ancillary elements, and products to meet the prescribed performance requirements.
Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards.
Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for construction in accordance with the approved design.
Assurance and Certification: Generate and supply comprehensive assurance documentation.
Coordination: Ensure coordination with various substrates, and other finishes to achieve integration within the overall project
Additional information: No Documentation is included at this point.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Kilnbridge Construction Services Ltd | - | 3 Jan 2025 | Active |
Notices
- 30 Jan 2024 Tender notice
- 15 Jan 2025 Contract award
Contracts Finder holds the official notices, with their documents and contact details.