OpenContracts

Energy Efficiency and Refurbishment (N7 — WS2/3 Framework)

LHC Complete Contract award

Buyer
LHC
Estimated value
£1,670,000,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Open procedure
Category
Works
CPV code
45000000 Construction work
First published
27 Oct 2015
Last updated
27 Oct 2015
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The provision of Energy Efficiency Measures and Refurbishment Works for Domestic and Public Sector buildings.
LHC seeks to establish a Framework Agreement for Energy Efficiency Measures and Refurbishment work.
Workstream 2 Individual Energy efficiency measure should be able to offer 1 or more of the following measures; External Wall Insulation (EWI), Cavity Wall Insulation, Internal Wall Insulation, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Boilers, Connection to District Heating Systems, Loft Insulation. All companies will be required to demonstrate the ability to deliver the measures. Under Workstream 2 companies can apply for 1 or more of the above measures. The evaluation under Workstream 2 will be carried out on each individual measure and awarded on this basis.
Workstream 3; Energy efficiency Measures and refurbishment works, companies applying shall be capable of providing all of the following services External Wall Insulation(EWI), Cavity Wall Insulation, Internal Wall Insulation, Biomass Boilers, Photovoltaic Systems, Heat Pumps, Gas Boilers, connection to district heating systems, Loft Insulation, and Refurbishment work.
For information Workstream 1 is for consultancy services and subject to a separate contract notice.

Awards

A framework award repeats the framework's whole value for each supplier given a place on it, so those values are not added up.

Notices

  1. 27 Oct 2015 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data