# EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Cable Management System Package

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 · Active · Tender notice

- Buyer: Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
- Estimated value: £500,000 (VAT not stated)
- Category: Works
- CPV code: 45311000 Electrical wiring and fitting work
- First published: 24 June 2024
- Last updated: 24 June 2024
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
      
      EKFB are looking for a competent contractor to provide the cable management system.
      
      Scope includes: CMS in the Incoming HV room A and B, Transformer room A and B, Tunnel ventilation control room, MNO Communications room, HS2 Communications and CCS room A and B are provided based on the CMS requirements specified in HS2 Standards. Further CMS routing up to the equipment shall be provided as per the final equipment layout.

## Notices

- 24 Jun 2024: Tender notice https://www.contractsfinder.service.gov.uk/Notice/656a5fd3-8666-4fae-a7d1-f7e9f19849aa

---
Page: https://opencontracts.uk/contract/ekfb-jv-mechanical-electrical-works-for-green-tunnel-portal-bui-9f3bc894-165d-4dfb-bf1f-8378a12d1da6
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.

