EKFB JV - Highways Works NC2A

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 Active Tender notice

Buyer
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Estimated value
£500,000 as published; Contracts Finder does not say whether VAT is included
Category
Works
CPV code
45233130 Construction work for highways
First published
29 May 2026
Last updated
29 May 2026
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.

We are seeking a specialist subcontractor to undertake the following works within the NC2A section:

The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Highways/ footpaths works, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The Subcontractor will be responsible for the temporary works design and temporary works construction as further detailed in this document.
The subcontractor will be responsible for all permanent and temporary works relating to the Highways realignment unless otherwise excluded. The works included as part of this scope to be delivered by the subcontractor are:
- Site clearance including Removal of existing drainage, kerbs, footpath, highway pavement, verges within permanent design location.
- Earthworks including excavation to formation, soft spot treatment if required.
- Drainage system, including temporary excavations, supply and installation of chambers, gullies, headwalls, carrier drains, filter and fin drains, fin drains, ditches, hydro brake system, non-return valve connection to existing drainage systems.
- Service ducts: including supply and installation of service ducts, connections and chambers.
- Road formation (asphalt surfacing by others): this includes supply and installation of geotextile separation materials highways and footways kerbs. Installation of capping and subbase layers


Please express your interest within this package.