OpenContracts

EcoSF4: Judas Gap Fish Pass Detailed Design

Environment Agency Complete Contract award

Buyer
Environment Agency
Estimated value
£73,826 as published; Contracts Finder does not say whether VAT is included
Awarded value
£73,826 as published, VAT not stated
Procedure
Call-off from a framework agreement
Category
Services
CPV code
90700000 Environmental services
First published
4 Mar 2026
Last updated
4 Mar 2026
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Judas Gap is an Environment Agency owned structure located at the saline limit on the River Stour on the Essex Suffolk border, NGR TM0799732809. The site already has a pumped eel pass installed in the old fish pass chamber.
The Judas Gap structure is critical in terms of fish movements for the Stour, for both freshwater fish that are trapped on the downstream side and migratory fish that require an entry/exit route to the freshwater system, both smelt and sea trout are present in the Stour estuary. The design will also need to ensure that eel passage is maintained.
The River Stour has an augmented water supply from the Ely Ouse to Essex Transfer Scheme (EOETS), water is pumped from the Gt Ouse to the top of the rivers Stour and Pant. Located in the Lower Stour is one of the main water supply abstraction points at Cattawade Intake, Essex and Suffolk Water (ESW) abstraction licence number 8/36/15/*S/0123, NGR TM1004933059. Work has been undertaken in the latest round of the Water Industry Natural Environment Programme (WINEP) to ensure flow continues down the Lower Stour and North Channel during low flow conditions, rather than being abstracted from the middle reaches of the Stour, this has been implemented to prevent large scale fish mortalities and wider ecological harm in this section of the river, the EA has worked with ESW to secure 5mld for the operation of a fish passage solution in this section. The requirement to impound water in this section of the river for public water supply abstraction inhibits the possibility for barrier removal. This section of the River Stour is also a navigable waterway.

Awards

SupplierValueDateStatus
Jeremy Benn Associates Limited (t/a JBA Consulting) £73,826 18 Feb 2026 Active

Notices

  1. 4 Mar 2026 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data