{
  "ocid": "ocds-b5fd17-6cc902ba-0cb0-4cc8-b337-406a71d64af0",
  "slug": "dock-civils-works-and-the-installation-of-both-temporary-and-pe-6cc902ba-0cb0-4cc8-b337-406a71d64af0",
  "rules": "Earlier rules (before the Procurement Act 2023)",
  "vat_stated": false,
  "title": "Dock Civils Works and The Installation of both Temporary and Permanent new Dock Gates, North End Shipyard, river Hull, Kingston Upon Hull",
  "display_title": "Dock Civils Works and The Installation of both Temporary and Permanent new Dock Gates, North End Shipyard, river Hull, Kingston Upon Hull",
  "url": "https://opencontracts.uk/contract/dock-civils-works-and-the-installation-of-both-temporary-and-pe-6cc902ba-0cb0-4cc8-b337-406a71d64af0",
  "json_url": "https://opencontracts.uk/contract/dock-civils-works-and-the-installation-of-both-temporary-and-pe-6cc902ba-0cb0-4cc8-b337-406a71d64af0.json",
  "buyer": {
    "name": "Hull City Council Adoption Services",
    "display_name": "Hull City Council Adoption Services",
    "slug": "hull-city-council-adoption-services",
    "url": "https://opencontracts.uk/buyer/hull-city-council-adoption-services",
    "json_url": "https://opencontracts.uk/buyer/hull-city-council-adoption-services.json"
  },
  "status": "active",
  "open_for_tenders": false,
  "stage": "Tender notice",
  "method": "Open procedure (below threshold)",
  "category": "works",
  "cpv_code": "34930000",
  "cpv_description": "Marine equipment",
  "description": "The works required for this procurement are dock civils and dock gate works at the North End Shipyard, River Hull, Kingston Upon Hull. The works required will be in two stages:- (i) initial works to install a temporary dock gate arrangement to make the North End Shipyard site safe, and dry, to enable ongoing works to the site as part of Hull's 'Maritime Project' to continue; (ii) following berthing in the North End Shipyard of the restored Arctic Corsair trawler (to be dry docked by the shipwright under a separate contract), which will become a permanent fixture and visitor attraction, the dock will require works to install a solid wall, to permanently and safely seal the North End Shipyard as a dry dock.\r\n\r\nStage One: Emergency Works - This stage relates to the works required to stop the current leak in the dock and create a temporary stop-log gate. The summary items to be delivered are:\r\n1.\tFor safety and to ensure a safe working environment in the dock, a remote movement monitoring system is installed on the existing gate. This will monitor deflection and movement under cyclic tidal induced hydrostatic loading. \r\n2.\tExisting gate is temporarily repaired to stop the leaks and make the dock watertight.\r\n3.\tContractor design of stop logs undertaken and logs procured.\r\n4.\tDock cheeks are reinforced and repaired to strengthen the structures in preparation of the construction of the stop-log gate.\r\n5.\tSteel guides are fitted on dock cheeks to allow for stop-logs installation.\r\n6.\tDock sill is modified to provide suitable foundation for the installation of the stop logs. \r\n7.\tMarine Plant is brought into the river and used to install the stop-logs.\r\n8.\tStop-log gate is checked for watertight integrity, and seals between logs are suitably repaired and/or made good.\r\n\r\nStage Two: This stage relates to the works required to facilitate the docking of the Arctic Corsair and seal the gate with a permanent solution. The summary items to be delivered are: \r\n1.\tThe dock wall is repaired and reinforced where necessary;\r\n2.\tThe river bed in front of NESY is dredged to facilitate dry-docking of the Arctic Corsair.\r\n3.\tHistoric dock gate is demolished, removed and scrapped.\r\n4.\tBefore the dry-docking operation, Marine Plant is brought into the river and used to lift the stop-logs out of the gate and temporarily positioned on a barge.\r\n5.\tTimber sleepers are inserted in the steel guides.\r\n6.\tFollowing the dry-docking of the Arctic Corsair, Marine Plant is used to reinstall the stop-logs and erect the gate.\r\n7.\tStop-log gate is suitably sealed and made safe in preparation for permanent sealing.\r\n8.\tA permanent dock wall is constructed behind stop logs, sealing the gate and making it watertight and structurally sound. This will be a reinforced concrete solution, to be cast in-situ.\r\n\r\nFull tender details, the complete ITT, specification, supporting documentation etc. is available via the Council's electronic tender portal, YORtender, accessible via weblink https://www.yortender.co.uk",
  "currency": "GBP",
  "estimated_value": "900000.00",
  "estimated_value_gross": null,
  "awarded_value": null,
  "awarded_currency": null,
  "awarded_is_gross": false,
  "is_framework": false,
  "tender_deadline": "2021-10-06T11:00:00+00:00",
  "first_published": "2021-09-10T19:24:38+00:00",
  "last_updated": "2021-09-10T19:24:38+00:00",
  "lots": [],
  "awards": [],
  "contracts": [],
  "notices": [
    {
      "notice_id": "17348871-9c78-49e3-8eee-7b8ee16e5022-467864",
      "label": "Tender notice",
      "date": "2021-09-10T19:24:38+00:00",
      "url": "https://www.contractsfinder.service.gov.uk/Notice/17348871-9c78-49e3-8eee-7b8ee16e5022",
      "source": "contracts_finder",
      "source_url": "https://www.contractsfinder.service.gov.uk/Notice/17348871-9c78-49e3-8eee-7b8ee16e5022",
      "retrieved_at": "2026-11-20T02:58:16.498058+00:00"
    }
  ],
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.",
  "source": "contracts_finder",
  "source_url": "https://www.contractsfinder.service.gov.uk/Notice/17348871-9c78-49e3-8eee-7b8ee16e5022",
  "retrieved_at": "2026-11-20T02:58:16.498058+00:00",
  "provenance": {
    "source": "contracts_finder",
    "source_url": "https://www.contractsfinder.service.gov.uk/Notice/17348871-9c78-49e3-8eee-7b8ee16e5022",
    "retrieved_at": "2026-11-20T02:58:16.498058+00:00"
  }
}