Design & Construction of a service tunnel & shaft for KW discharge drainage pipework replacement
Merseytravel Active Tender notice
- Buyer
- Merseytravel
- Estimated value
- £300,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Open procedure
- Category
- Works
- CPV code
45000000Construction work- First published
- 17 Dec 2018
- Last updated
- 17 Dec 2018
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
Merseytravel is seeking to employ a suitably qualified Tunnel Engineering Design and Construction Company for the construction of a service tunnel and shaft for Kingsway Tunnels Discharge Drainage Pipework Replacement. The works are within the inverts of the two bores of the Kingsway Tunnel under the River Mersey. Merseytravel operates the two River Mersey underwater road crossing tunnels between Liverpool and Wallasey, Liverpool and Birkenhead in Merseyside. The Kingsway road tunnel is a twin tube tunnel, completed in 1971 and 1974, carries two traffic lanes under the River Mersey between Liverpool and Wallasey, Maximum speed is limited to 40 mph and annual throughput traffic is 13.5 million. Merseytravel would welcome interest from a suitably qualified Tunnel Engineering Design and Construction Company partner to assist with the design construction of the service tunnel.
Notices
- 17 Dec 2018 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.