OpenContracts

Design, Build, Install, Maintenance - construction of 1MW Solar Farm

Halton Borough Council Active Tender amendment

Buyer
Halton Borough Council
Estimated value
£1,200,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Open procedure (above threshold)
Category
Works
CPV code
09332000 Solar installation
First published
30 Nov 2018
Last updated
4 Jan 2019
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The Council has secured European Regional Development funding (ERDF) and has been developing a 1MWp solar farm on a former brown-field site, a former golf course built on a capped chemical landfill site in Widnes. Project name-the Greening Derelict, Underused and Neglected Land Demonstrator Project.The Council own the land on which the scheme is to be built, and will own the solar PV plant once it is commissioned and handed over.Seeking EPC (Engineer Procure and Construct) proposals for the turn-key design, installation and commissioning of the 1MWp solar farm.Following completion of the construction works. The EPC Contractor shall be responsible for providing warranty and O&M (Operations and Maintenance) services for a period of two years initially with the option for the Council to offer up to 7 extensions of the contract period of 3 years each.Contractors are required to price :Private wire connectionSleeved PPA connection

Notices

  1. 30 Nov 2018 Tender notice
  2. 4 Jan 2019 Tender amendment

Contracts Finder holds the official notices, with their documents and contact details.

Data