Design and Construction of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site
Cyson Cymru Active Tender notice
- Buyer
- Cyson Cymru
- Estimated value
- £2,700,000 excluding VAT; £3,240,000 including VAT
- Procedure
- Below threshold - open competition
- Category
- Works
- CPV code
45000000Construction work- First published
- 21 Jul 2026
- Last updated
- 21 Jul 2026
- Legal basis
- Procurement Act 2023
Description
Cyson Cymru, on behalf of Newport City Council (NCC), is seeking Engineering, Procurement and Construction (EPC) proposals for the turnkey design, installation, and commissioning of the solar farm and a DC coupled battery with a 400V grid connection at the Newport City Council’s recycling centre depot in Newport, to form a fully compliant and working installation.
It is anticipated that the EPC contract will be awarded in 2026, and the design and construction will be undertaken in 2026/7.
The Contractor will be responsible for the supply, installation, and maintenance of a solar photovoltaic and battery system (the ‘Works’) up to 1.1MWp in gross PV capacity with a 2MWh DC battery energy storage system (BESS) on the land shown in Appendix 19.3 of the Specification, and located at grid reference ST306857.
ITT Reference: ITT_126083
Please note that a pre market engagement notice was previously published in relation to this tender. MAR594663
Notices
- 21 Jul 2026 Tender notice 068661-2026
Find a Tender holds the official notices, with their documents and contact details.