CWF Lot 2A - Reconstruction of Scrithwaite Wood Retaining Wall
Westmorland and Furness Council Complete Contract award
- Buyer
- Westmorland and Furness Council
- Estimated value
- £75,000 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £116,868 as published, VAT not stated
- Procedure
- Other -
- Category
- Works
- CPV code
45000000Construction work- First published
- 31 Mar 2025
- Last updated
- 31 Mar 2025
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
his project is for the design and reconstruction of approximately 15m length of Scrithwaite Wood Retaining Wall on the C5008, North of Broughton Mills.
The existing wall has partially collapsed, with an adjacent length being in an unstable condition. The wall retains approximately 2.1m (max) of land (public highway) above a steep inclined slope. The collapsed section of the wall has created a residual slope of consolidated material with a 1m vertical slope of exposed natural gravel material below the defined road construction.
The Contractor will be required to undertake the role of Principal Designer & Principal Contractor and fulfil their obligations in accordance with CDM 2015.
The Contractor will be required to design and construct the permanent engineered highway retaining wall.
The Contractor will be required to design and check temporary works as required e.g. provision of shoring for excavation.
The Contractor should consider the design period required for the temporary and permanent works, including Technical Approval to CG300 and Design & Check Certification - considered to be a Category 0 structure.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Metcalfe Plant Hire Ltd | £116,868 | 31 Mar 2025 | Active |
Notices
- 31 Mar 2025 Contract award
Contracts Finder holds the official notices, with their documents and contact details.