Corner Plot - Fire Engineer
Rochdale Metropolitan Borough Council Complete Contract award
- Buyer
- Rochdale Metropolitan Borough Council
- Estimated value
- £35,000 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £35,000 as published, VAT not stated
- Procedure
- Direct award
- Category
- Services
- CPV code
71315200Building consultancy services- First published
- 26 Jan 2024
- Last updated
- 26 Jan 2024
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
OFR have been appointment to provide MEP Services for Stage 2-5 on the works taking place at the Corner Plot, Rochdale Station Square. The roles and requirements will include,
Scope of Works
-Establish the design brief with the Client and confirm the relevant fire safety design
objectives for the project.
-Confirm any additional design requirements such as insurance.
-Highlight any significant constraints arising from the site such as fire service access, boundary conditions, water supplies and crowd dispersal, etc.
-Identify where a fire engineered (non-standard) approach could add value by
reducing build costs, shortening the construction programme or enhancing the
design (e.g. increasing net area, flexibility and functionality).
-Expand on the level of detail provided to align with the developing design.
Specifically, additional and more detailed advice will be required with regards to
the fire safety requirements for MEP services and equipment, fire dampers,
penetrations through fire resisting construction, risers, etc. The Fire Engineer to
also identify key fire compartmentation interfaces internally and externally.
-Develop the detailed fire strategy report, covering and progressing the same key
issues, as outlined in the Concept Design stage scope above.
-Detailed advice will be required with regards to the fire safety requirements for
MEP services and equipment, fire dampers, penetrations through fire resisting
construction, risers, etc. OFR to also identify key fire compartmentation interfaces
internally and externally.
-Attend workshops and technical design meetings and comment on design iterations
to meet the demands of the programme.
-Attend meetings with the approval's authorities, to discuss the outline proposals
with a view of minimising the approvals risk. Also help to drive the Fire Service
consultation process at this stage by working with the lead approver to ensure
consultation takes place as early as possible.
-Review the design documentation produced by others for compatibility with the
fire strategy, commenting accordingly, and make all reasonable endeavours to
ensure consultants are producing documentation which complies with the Fire
Design Strategy Report. This may require the OFR to set up specific fire
coordination meetings with the other key consultants (Architect, MEP, Structures,
Accessibility, Façade, Vertical Transportation, CDM).
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| OFR Consultants | £35,000 | 14 Sep 2023 | Active |
Notices
- 26 Jan 2024 Contract award
Contracts Finder holds the official notices, with their documents and contact details.