CHP LTHW Heat Recovery Principal Contractor
The Pirbright Institute Active Tender amendment
- Buyer
- The Pirbright Institute
- Estimated value
- £315,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Open procedure (below threshold)
- Category
- Works
- CPV code
09300000Electricity, heating, solar and nuclear energy- First published
- 2 Dec 2024
- Last updated
- 16 Dec 2024
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
The Pirbright Institute is inviting tenders for the CHP LTHW Heat recovery project - Principal Contractor & Installation Work Package.
The contract is for a single supplier to provide the Principal Contractor role and deliver Mechanical & Electrical Installation, commissioning of the CHP LTHW Heat Recovery project.
As part of this tender scope a RIBA3 Design for Tender M&E package has been provided to enable vendors to price this work package.
The contract is for a single supplier to be the Principal Contractor and to deliver Mechanical & Electrical installation works for the integration of a heat recovery system from the sites existing CHP to the Plowright Building at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF.
The scope of works will involve:
• Preparation for a construction ready design as outlined in Section 4.4. Appendix E - CHP LTHW Heat Recovery Principal Contractor Specification V1.1.
• Supply, manufacture, delivery and installation of Mechanical & Electrical works as outlined in the provided design pack within this ITT.
• Planning of works and required shutdowns to implement enabling works
• Working with nominated controls contractor to ensure implementation of control packages are planned accordingly into construction phase program
• Final commissioning on completion of system installation.
• On completion of commissioning, remove and dispose of any redundant plant & equipment
• Management of all subcontractors employed by the supplier to complete these works.
• Training and Operational Procedures
• On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning. A separate section should be provided to show details of the following:
o Brief Description of the works being carried out.
o Project Risk Assessment.
o Key structural principals.
o Hazardous materials used.
o Information on the future removal of installed plant.
o H&S information about equipment provided for cleaning or maintaining installed plant.
o The nature, location and markings of significant services.
o Information and as built drawings of buildings, plant and equipment.
o Step by step activities to carry out the works.
o Lesson Learnt, challenges met and how they were overcome.
A CDM Construction site will be set up as part of the overall project which will provide for the following:
• Site Supervision
• HERRAS fencing and appropriate signage around CDM area
• Site Office
• Welfare Office including changing areas
• Waste skips
• Scissor lift
• Fork-lift truck / telehandler
• CDM documentation / inductions / daily logs / management of RAMS
For this tender, the supplier is required to provide a cost for annual servicing of the newly installed heat recovery plant. The requirements for this service contract are:
• Spares List showing the itemised costs.