OpenContracts

Central Substation RIBA4 & Build

KBS Maritime Ltd Active Tender notice

Buyer
KBS Maritime Ltd
Estimated value
£1,300,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Restricted procedure
Category
Works
CPV code
45000000 Construction work
First published
25 Feb 2026
Last updated
25 Feb 2026
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

Notices

  1. 25 Feb 2026 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data