CCTV & Jetting Package for NEAR South Project
Balfour Beatty Civil Engineering Limited Active Tender amendment
- Buyer
- Balfour Beatty Civil Engineering Limited
- Estimated value
- £180,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Competitive procedure with negotiation (above threshold)
- Category
- Works
- CPV code
45232450Drainage construction works- First published
- 30 Nov 2023
- Last updated
- 30 Nov 2023
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
This notice is to advertise the CCTV and Jetting Package of works for the NEAR (National Emergency Areas Retrofit) Schemes on behalf of SMP Alliance.
Scope: Provision of a CCTV, Jetting and Drainage Survey Reports at proposed emergency bays to include Plant, Equipment, labour, and survey reports to CD 551 & CD 535.
Quantity of bays and Locations:
M25 J5 to J7 - 8 locations of approximately 200m in length including pipes, drainage chambers and outfalls - 2 x surveys (pre & post construction).
M20 J3 to J5 - 4 locations of approximately 200m in length including pipes, drainage chambers and outfalls - 2 x surveys (pre & post construction).
M25 J23 to J27 - 14 locations of approximately 200m in length including pipes, drainage chambers and outfalls - 2 x surveys (pre & post construction).
M3 J2 to J4a - 10 locations of approximately 200m in length including pipes, drainage chambers and outfalls - 2 x surveys (pre & post construction).
M4 J10 to J12 - 12 locations of approximately 200m in length including pipes, drainage chambers and outfalls - 2 x surveys (pre & post construction.)
Anticipated start date: February 2024
Anticipated Duration: Eight to Ten Months
(Note - Whilst some location will be concurrent, continuity of work is unlikely)
Works to be completed on weekdays under traffic management provided by the main contractor.
Specification: CD 551 Drainage Surveys & CD 535 Drainage Asset Data and Risk Management.
Any interested Contractors will need to hold a valid Constructionline Gold Membership and be willing to maintain the accreditation's validity throughout the duration of the project.
It is also a requirement for all Contractors to be National Highways Sector Scheme Approved.
Please note, the package value listed on this notice is approximate and subject to change.