Car Park Re-surfacing Works
Norton-juxta-Kempsey Parish Council Complete Contract award
- Buyer
- Norton-juxta-Kempsey Parish Council
- Awarded value
- £35,100 as published, VAT not stated
- Procedure
- Other - Please apply directly to the buyer using the contact details provided
- CPV code
45000000Construction work- First published
- 19 Oct 2018
- Last updated
- 13 Dec 2018
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
Norton Parish Hall Car Park Re-surfacing Proposal Specification
Site address: Norton Parish Hall, Wadborough Road, Littleworth, Worcs WR5 2QB
Work required: -
Car Park Area 1 (see attached plan):
• Remove the top layer of existing stone
• Install edging as plan with 150 mm high x 50mm thick bull-nosed kerbs, fixed and haunched in concrete (approx. 17.5 m long)
• Level with top soil and then grass seed the area beyond the edging
• Cover whole area with 50mm deep Forest of Dean 20mm gravel (reddish in colour)
Car Park Area 2 (see attached plan):
• Scrape out and consolidate for new road to a width of 6 metres x 125mm deep as shown on the plan. Shuttering with steel road forms. Pour in road-form quality concrete, vibrate and level.
• Provide expansion joints with dowel bars every 10 metres to help prevent cracking.
• Install edging in area 2, alongside the ditch, as plan with 150mm high x 50mm thick bull-nosed kerbs, fixed and haunched in concrete (approx. 65 m long) Level ditch area with top soil up to the new kerbs and seed.
• Lift and reset manhole covers to required levels
• Create small area of grey pressed concrete slabs 1800mm x 1800mm at bottom of ramp to pre-school to assist wheelchair access.
• Create small area of grey pressed slabs 1200mm x 3600mm in front of pre-school container to ease access
• Scrape to correct levels and cover all areas around the road etc as per plan with 20mm Forest of Dean gravel
• Retain the 3 existing ramps to the Hall building
Bin Store Area:
• Remove existing concrete base adjacent to the LPG tank, container posts, tree & surround and old tree stump
• Fix 900mm wide gate on existing path
• Create ramp from side door up to new bin storage area.
• Consolidate in stone hardcore where required and create new slabbed bin storage area with
600mm x 600mm grey pressed concrete slab. The slabbed area to be around LPG tank, level with Hall building and extending as far as the telegraph pole.
• Provide and install a fence of 125mm wide feather edged boards on 100 mm x 100mm timber supports (set in concrete), 150mm timber gravel boards and timber cross rails (x3) around the bin storage area.
• Fix pair of gates x 900mm each to provide access to front, gates to have galvanised furniture.
All waste to be cleared away in a proper manner, with the site left in a clean and tidy condition ready for use; and for all relevant Health & Safety legislation and guidance to be followed.
Please apply directly to the buyer using the contract details provided.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Albion Paving & Landscapes | £35,100 | 29 Nov 2018 | Active |
Notices
- 19 Oct 2018 Tender notice
- 13 Dec 2018 Contract award
Contracts Finder holds the official notices, with their documents and contact details.