OpenContracts

Brundtland Building Tower Block - Space Cooling Project

Craig Pullen Consulting Active Tender notice

Buyer
Craig Pullen Consulting
Estimated value
£200,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Open procedure (below threshold)
Category
Works
CPV code
45331000 Heating, ventilation and air-conditioning installation work
First published
10 May 2021
Last updated
10 May 2021
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Since the Brundtland Building Tower Block thermal performance upgrades were completed several years ago, overheating of teaching spaces has become a problem. As a result, Bedford College are proceeding with installation of a hydronic cooling system on Levels 1 and 2 of the building.

The cooling system will also provide low carbon background heating during the winter season by means of the reverse cycle air source heat pumps that are being installed as part of this project.

Building efficiency will be further improved by the installation of a control system furnished by Genius Hub as part of this upgrade package.

Tender packs can be obtained from [email removed]

Notices

  1. 10 May 2021 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data