# Brewery Turnback - ES6-8 Civil Engineering

Kier Infrastructure and Overseas - CP7 NWC · Active · Tender notice

- Buyer: Kier Infrastructure and Overseas - CP7 NWC
- Estimated value: £1,000,000 (VAT not stated)
- Category: Works
- CPV code: 45200000 Works for complete or part construction and civil engineering work
- First published: 7 October 2025
- Last updated: 7 October 2025
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. 
      
      At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. 
      
      The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.  
      
      As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. 
      
      The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. 
      ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.  
      
      Ancillary Civil Engineering Scope of Work:
      The supply and installation of the new infrastructure. This includes, but is not limited to, the following: new cable trough route, new signal foundations, new LOC foundations, ARMCO barriers, fencing, ducting system, and URX system. This includes all handback deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.

## Notices

- 7 Oct 2025: Tender notice https://www.contractsfinder.service.gov.uk/Notice/9f791490-ed70-4330-8333-c8679e0531ff

---
Page: https://opencontracts.uk/contract/brewery-turnback-es6-8-civil-engineering-9689bce4-6822-43cd-a402-5a3db4050506
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.

