Blue Corridors in channel obstacle works - Rye 1

North York Moors National Park A Active Tender notice

Buyer
North York Moors National Park A
Estimated value
£83,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Open procedure (below threshold)
Category
Works
CPV code
45221220 Culverts
First published
6 May 2022
Last updated
6 May 2022
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

2.1 Objectives of the Contract
The key objectives of the contract are to undertake easement works to the barriers, identified in Table
1.1, above. All easement works are scheduled to take place in 2022. Easements proposed to be
constructed are summarised within Table 2.1, below:
Table 2.1: Easement Summary
Reference Barrier Easement Description
Rye 20 Stone culvert Addition of two pre-weirs downstream of road culvert
Rye 21 Single culvert Replacement with 3.0m span multi-plate bottomless arch culvert
Rye 22 Triple culvert Replacement with 4.0m span multi-plate bottomless arch culvert
The appointed Principal Contractor shall be responsible for carrying out all elements of the
construction works subject to the approval of the Client / Project Manager.
This Pre-Construction Information (PCI) document should be read in conjunction with the Contract
Data including the Risk Register and design drawings for the project.
2.2 Scope of Works
The works are outlined below and detailed within the design drawings and shall be appointed under
one contract per easement works. This document details the works required to be conducted at the
This PCI provides health and safety information as part of the Construction (Design and Management)
Regulations 2015 (CDM 2015). It shall be issued as part of the tender documents to the various
organisations who have been invited to bid for the works.
The key activities for each easement works contract are outlined below. All...annel;
Erect Multi-Plate Bottomless Arch Culvert (MP-BAC) from pre-fabricated plates and cast in-situ
concrete headwall, to tie-in to foundations;
Place armour stone to watercourse at culvert inlet, outlet and along length of culvert, reinstate
bed with stone, as per design specification;
Backfill by placement and compaction (of retained fill) in layers, to sides and above crest of the
installed arch culvert; and
Reinstatement of track surface, with compacted Type 1 (minimum 0.2m) underlain by Terram
1000 (or similar).
2.2.3 Rye 22 Replacement of single culvert with 4.0m span bottomless arch culvert
Works to be undertaken on a private track crossing Bonfield Gill;
Remove existing track and culverts, excavate to commencing level for the placement of culvert
foundations regrade existing bed, and install bed protection, as per design specification;
Placement and compaction of Type 1 subbase as formation layer and cast in-situ strip
foundations, including arch seating channel;
Erect MP-BAC from pre-fabricated plates and cast in-situ concrete headwall, to tie-in to
foundations;
Add rock armour added to watercourse at culvert inlet, outlet and along length of culvert,
reinstate bed with stone, as per design specification;
Backfill by placement and compaction (of retained fill) in layers, to sides and above crest of the
installed arch culvert; and
Reinstatement of track surface with concrete slab.
Full details are supplied in the additional documents