{
  "ocid": "ocds-b5fd17-ff3eaed9-e376-4a1e-833a-afb29e5344c6",
  "slug": "blue-corridors-in-channel-obstacle-works-box-culverts-ff3eaed9-e376-4a1e-833a-afb29e5344c6",
  "rules": "Earlier rules (before the Procurement Act 2023)",
  "vat_stated": false,
  "title": "Blue Corridors in channel obstacle works - Box Culverts",
  "display_title": "Blue Corridors in channel obstacle works - Box Culverts",
  "url": "https://opencontracts.uk/contract/blue-corridors-in-channel-obstacle-works-box-culverts-ff3eaed9-e376-4a1e-833a-afb29e5344c6",
  "json_url": "https://opencontracts.uk/contract/blue-corridors-in-channel-obstacle-works-box-culverts-ff3eaed9-e376-4a1e-833a-afb29e5344c6.json",
  "buyer": {
    "name": "North York Moors National Park Authority",
    "display_name": "North York Moors National Park Authority",
    "slug": "north-york-moors-national-park-authority",
    "url": "https://opencontracts.uk/buyer/north-york-moors-national-park-authority",
    "json_url": "https://opencontracts.uk/buyer/north-york-moors-national-park-authority.json"
  },
  "status": "active",
  "open_for_tenders": false,
  "stage": "Tender notice",
  "method": "Open procedure (below threshold)",
  "category": "works",
  "cpv_code": "90700000",
  "cpv_description": "Environmental services",
  "description": "2.1 Objectives of the Contract\r\nThe key objectives of the contract are to undertake easement works to the barriers, identified in Table\r\n1.1, below. All easement works are scheduled to take place in 2022. Easements proposed to be\r\nconstructed are summarised below:\r\nEasement Summary: Reference, Barrier Type, Easement Description:\r\nRye 18 Vented Ford Replacement with triple barrel 10 m long 1.25 m wide x 0.75 m rise\r\nprecast concrete rectangular box culvert\r\nEsk 5 Vented Ford Replacement with triple barrel 10 m long 1.25 m wide x 0.75 m rise\r\nprecast concrete rectangular box culvert\r\nEsk 13 Vented Ford Replacement with triple barrel 8 m long 1.50 m wide x 1.00 m rise\r\nprecast concrete rectangular box culvert\r\nThe appointed Principal Contractor shall be responsible for carrying out all elements of the\r\nconstruction works subject to the approval of the Client / Project Manager.\r\nThis Pre-Construction Information (PCI) document should be read in conjunction with the Contract\r\nData including the Risk Register and design drawings for the project.\r\nPlanning and drainage consent for the works is currently in progress.\r\n2.2 Scope of Works\r\nThe works are outlined below and detailed within the design drawings and shall be appointed under\r\none contract per package of easement works. This document details the works required to be\r\nconducted at the easement.\r\nThis PCI provides health and safety information as part of the Construction (Design and Management)\r\nRegulations 2015 (CD...d formation surface;\r\nPlace box culvert sections into required locations (invert of central culvert section to be\r\n100mm lower than that of the 2 other culvert sections);\r\nApply jointing seals between culvert sections (as per box culvert supplier's recommendations);\r\nRe-grade watercourse bed to tie in to proposed culvert invert levels, reinstate bed with\r\nselected excavations or imported clean stone as directed on site;\r\nPlace clean stone to bed and banks immediately downstream of culvert outfall and set stone in\r\nconcrete bed for up to 2m downstream of culvert, as directed on site;\r\nBackfill and compact to sides of installed sides of culverts as required;\r\nAdd dowel /bolt connection between box culvert and concrete slab above;\r\nPlace 150-250mm deep A252 mesh reinforced C40 concrete on culvert sections (and tying\r\ninto existing road surface);\r\nAdd sealant waterproofing above the reinforced concrete layer;\r\nCast in-situ concrete headwalls, with weepholes on downstream headwall, to tie-in to concrete\r\nbox culvert sections;\r\nAdd half battered double kerbs with transition kerbs at each end on upstream and downstream\r\nheadwalls;\r\nLay tarmac running surface (and tying into existing road surface);\r\nAttach 1.1m high handrail on upstream and downstream headwalls;\r\nReinstate disturbed banks, tying into culvert headwall; and\r\nPlace armour stone to watercourse at culvert outlet and reinstate upstream bed to lowered\r\nlevel.\r\nFull details are supplied in the additional documents",
  "currency": "GBP",
  "estimated_value": "205000.00",
  "estimated_value_gross": null,
  "awarded_value": null,
  "awarded_currency": null,
  "awarded_is_gross": false,
  "is_framework": false,
  "tender_deadline": "2022-07-05T11:00:00+00:00",
  "first_published": "2022-06-13T16:45:09+00:00",
  "last_updated": "2022-06-13T16:45:09+00:00",
  "lots": [],
  "awards": [],
  "contracts": [],
  "notices": [
    {
      "notice_id": "80a74905-5a03-4818-a773-25213ef366dc-545921",
      "label": "Tender notice",
      "date": "2022-06-13T16:45:09+00:00",
      "url": "https://www.contractsfinder.service.gov.uk/Notice/80a74905-5a03-4818-a773-25213ef366dc",
      "source": "contracts_finder",
      "source_url": "https://www.contractsfinder.service.gov.uk/Notice/80a74905-5a03-4818-a773-25213ef366dc",
      "retrieved_at": "2026-11-20T14:13:56.032770+00:00"
    }
  ],
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.",
  "source": "contracts_finder",
  "source_url": "https://www.contractsfinder.service.gov.uk/Notice/80a74905-5a03-4818-a773-25213ef366dc",
  "retrieved_at": "2026-11-20T14:13:56.032770+00:00",
  "provenance": {
    "source": "contracts_finder",
    "source_url": "https://www.contractsfinder.service.gov.uk/Notice/80a74905-5a03-4818-a773-25213ef366dc",
    "retrieved_at": "2026-11-20T14:13:56.032770+00:00"
  }
}