A57 Compound Civils
Balfour Beatty Civil Engineering Limited Active Tender notice
- Buyer
- Balfour Beatty Civil Engineering Limited
- Estimated value
- £250,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Competitive procedure with negotiation (above threshold)
- Category
- Works
- CPV code
45200000Works for complete or part construction and civil engineering work- First published
- 27 Mar 2024
- Last updated
- 27 Mar 2024
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
Works include
- Hedgerow site clearance (including Root removal).
- Temporary hardstanding for access arrangements.
- Minor archaeology mitigation works within the site compound, to compromise of an excavator plus driver to work as directed by the onsite archaeologist.
- Topsoil Strip to the full extents of the site compound, the stripped topsoil will be used as 3m high screening bunding around the perimeter of the site compound, any excess topsoil will be stored locally to the compound no further that 600m away.
- Installation of drainage pipes associated chambers and outfall / office accommodation pipework (note stubs out of the ground to be installed for office accommodation only, final connections will be completed by another)
- Drainage gullies in line with design, 2 stage approach to be priced 1st stage below tarmac level, 2nd stage build up to finished tarmac level.
- Associated Kerb installation including Aco units and outfalls.
- Balancing outfall pond and associated inlet and outlet pipes including headwalls.
- Placement and compaction of subbase / capping layers to the underside of surfacing level.
- Installation of comms and lighting ducts and associated chambers to facilitate office accommodation and lighting / CCTV requirements.
- Installation and hardstanding of stats utility pads
- Removal of existing footpaths and kerbs to accommodate new compound entrance.
- V-ditches around the compound and associated outfall pipes / headwalls
- Foul drainage connection pipe work into United Utilities existing asset
- United Utilities protection works to asset as detailed in TW details
Notices
- 27 Mar 2024 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.