# 9711 - Provision and installation of a 24m x 2.5m bridge over the River Yare, between Bowthorpe Southern Park and Church Farm, Watton Road, Colney, Norwich NR4 7TX with associated landscape works

Norwich City Council e-Tendering · Active · Tender amendment

- Buyer: Norwich City Council e-Tendering
- Estimated value: £81,000 (VAT not stated)
- Procedure: Open procedure (below threshold)
- Category: Works
- CPV code: 45220000 Engineering works and construction works
- First published: 15 November 2017
- Last updated: 16 November 2017
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

The Green Infrastructure Delivery Board (a partnership between Broadland District Council, Norwich City Council, South Norfolk Council, Norfolk County Council and the New Anglia Local Enterprise Partnership) wish to provide a new bridge across the River Yare, which runs along the southern boundary of the city of Norwich. 
      
      The bridge will link an existing public footpath (Norwich FP3) which runs north to south across Bowthorpe Southern Park too an existing Bridleway (Colney BR2) which emerges onto the B1108 Watton Road via Church Farm, Colney, Norwich NR4 7TX . The bridge will reconnect the two rights of way, re-establishing the historic link that was lost when the previous bridge was washed away in the 1950's 
      
      The bride will provide a direct link between the housing in Bowthorpe and the major employment locations at the Norwich Research Park (NRP) and the Norfolk and Norwich University Hospital (NNUH) . It will facilitate journeys to work on foot and also allow workers from the NRP and NNUH recreational access to Bowthorpe Southern Park and the riverside walk.  
      
      From an environmental angle, the material for the bridge access ramps will be excavated from site; from one of the ponds that was created when gravel was previously extracted for highways works.  The excavations will allow for the creation of a fish fry refuge along the edge of the pond, which will be connected to the River Yare by an underground culvert and the infilling of a  breach in the existing footpath.   The 
      
      The budget available for this project is between £74,000 and £81,000.

Additional information: Please download tender documents and upload completed tenders using the link: 

https://in-tendhost.co.uk/norwich/aspx/Home

Is a Recurrent Procurement Type? : No

## Notices

- 15 Nov 2017: Tender notice https://www.contractsfinder.service.gov.uk/Notice/f1ed4164-4901-4b59-b55e-e9bcf7685f7e
- 16 Nov 2017: Tender amendment https://www.contractsfinder.service.gov.uk/Notice/f1ed4164-4901-4b59-b55e-e9bcf7685f7e

---
Page: https://opencontracts.uk/contract/9711-provision-and-installation-of-a-24m-x-25m-bridge-over-the-816072c0-0a14-4e42-9def-6bb930ec6c68
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.

