621600 - Western IC entry slip road pavement - construction phase support
National Highways Complete Contract award
- Buyer
- National Highways
- Estimated value
- £231,186 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £231,186 as published, VAT not stated
- Procedure
- Call-off from a framework agreement
- Category
- Works
- CPV code
45233210Surface work for highways- First published
- 16 Oct 2025
- Last updated
- 16 Oct 2025
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
A63 Western IC EB Entry Slip Road - 2000A63/443 (0.755km long)
This is a single lane slip road which leads off the A15 SB. Records indicate this slip road was resurfaced in 2016 with some previous deeper targeted inlays
completed in 2008.
The current defects include surface course deterioration, joint deterioration and cracking. Some defects are present in the local authority owned section, 10m prior to the start of the slip road - the scheme has been extended to incorporate these defects. There are currently no concerns with regards to texture however, between Ch.0m and 150m SCRIM is as low as -.005. There are two isolated areas of rutting at 11.5mm and TSD Cat 3 has been recorded between Ch.0m and 150m. Deflectograph data is not currently available. Wholescale inlays of 90mm deep are proposed for the entire length of the slip road. This approach acknowledges the core findings and Cat 3 TSD readings however, there are no significant structural failures and this depth is deemed appropriate given the visual defects. The only other option would be to go much deeper (full depth reconstruction) and the low traffic figures and type of defects do not
justify this.
The chevron area between the slip road and mainline is to be resurfaced. The existing drainage channels are to be replaced as they are life-expired and difficult to maintain. It should be noted that slot drainage now requires a departure from standards, refer to Appendix G for alternative drainage system to be used. Additional information/survey data to be passed onto the Detail Designer as soon as it becomes available. The full extents of the slip road should be renewed - extend into lane 1 (full width) if necessary to ensure the narrow end is fully renewed.
There are no structures affected by this scheme. Loops have not been identified within the scheme extent
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| DSD Construction Limited | £231,186 | 28 Apr 2025 | Active |
Notices
- 16 Oct 2025 Contract award
Contracts Finder holds the official notices, with their documents and contact details.