604077 - Topographical survey TST Area 7
Highways England Active Tender notice
- Buyer
- Highways England
- Estimated value
- £50,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Competitive quotation (below threshold)
- Category
- Works
- CPV code
45200000Works for complete or part construction and civil engineering work- First published
- 25 Jul 2019
- Last updated
- 25 Jul 2019
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
A52 Bramcote to Priory Safety Scheme GPR Survey and Trial Pits
1.1.1 The principal objective of this project is to carry out Ground Penetrating Radar followed up with trial pits to confirm the GPR. Then subsequently provide associated reports & dwgs.
1.1.2 WAC/Asbestos testing of soil taken from each trial pit, 18 in total.
1.1.3 Preliminary Waste Classification Assessment and summary of samples taken to be provided.
1.1.4 The specification that applies to the services is included in Section 6
1.3.1 The Consultant is required to produce the following deliverables:
(1) An appropriate individual to attend pre-commencement site inspection & client meeting.
(2) Propose temporary traffic management required. Once agreed Employer will provide the temporary traffic management.
(3) The contractor is to provide plant, materials & labour to carry out all project objectives stated in this document.
(4) Plant, materials & labour to carry out a GPR survey on site for the timings as stated in section 3 and specification as stated in section 6.
(5) CAD dwgs, trial pit data & reports as detailed in section 6 within 2 weeks of works being completed on site.
(6) Reports as detailed in section 6.
Notices
- 25 Jul 2019 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.