1-574 Power Generation from Structures - Stage 2 - Develop (Trial)
Highways England Complete Contract award
- Buyer
- Highways England
- Estimated value
- £97,715 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £97,716 as published, VAT not stated
- Procedure
- Call-off from a framework agreement
- Category
- Services
- CPV code
73000000Research and development services and related consultancy services- First published
- 27 Aug 2019
- Last updated
- 27 Aug 2019
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
Highways England aim to deploy renewable energy source technologies (e.g. wind, solar) on structures across the SRN to power the technology with no or reduced reliance on Distribution Network Operator (DNO) supplies.
The overall task is broken down into five stages, as outlined below. This task takes the outcome of the Options Report in Stage 1 and implements the procurement strategy and trial design developed in Stage 2 Phase 1:
Stage 1. Discover - understand the technology solutions available and relevant to the needs of Highways England. Produce an Options Report.
Stage 2. Develop - develop a modular solutions model for the various structures deployed on the network or test site for prototype testing. (Note: this is broken into two phases to provide an investment decision point between preparing a trial design and delivering the trial).
Stage 3. Demonstrate - deploy a trial system operating at sample sites and undertake performance measurement over a 12-month period across 2 pilot schemes and present findings for consideration.
Stage 4. Deliver - undertake full product approval trials/documentation and acceptance testing.
Stage 5. Deploy on new and retrofit schemes.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Arup | £97,716 | 22 Aug 2019 | Active |
Notices
- 27 Aug 2019 Contract award
Contracts Finder holds the official notices, with their documents and contact details.