OpenContracts

1-1032 AD10 BHLB Assessment 20/21

Highways England Complete Contract award

Buyer
Highways England
Estimated value
£169,995 as published; Contracts Finder does not say whether VAT is included
Awarded value
£169,996 as published, VAT not stated
Procedure
Call-off from a framework agreement
Category
Services
CPV code
73000000 Research and development services and related consultancy services
First published
17 Feb 2020
Last updated
17 Feb 2020
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Operations Directorate (OD) is seeking continued technical assistance and support in completing the steady state management of M60 Barton High Level Bridge (BHLB).

BHLB has recently been assessed for 40t loading and its ability to be jacked under live load for the Category 3 spans. A number of steady state issues in its current condition have been identified during BHLB ongoing 40t assessment work that need to be managed and/or rectified in order to safeguard the bridge's future and operation of the M60 in a planned way.

The bridge is being managed under HE policy and procedures, BD79, Management of Substandard Structures, agreed with Safety Engineering and Standards (SES) Division on the understanding that concerns will be addressed through planned bridge bearing adjustment works. The issues of most concern were to have been addressed through the final year of the ASC 10 commission, which completed on 29th March 2019, but some work transferred into The AD 10 contract.

Assessment work going forward will inform the newly appointed Asset Delivery Contract who will manage the future remedial and repair works to Barton Bridge and agree any longer-term, online monitoring strategy that is preferred to expensive and disruptive strengthening works. Continued delivery of design works will also ensure that the main canal spans are in a state of readiness to be jacked at short notice.

This initial task work will continue to address the assessment of the largest, Category 3 spans over the Manchester Ship Canal. AD 10 will use the outputs produced by Atkins, in conjunction with SES, to finalize a design brief to instruct the Area 10 Design Services Contractor, Amey. Amey will complete its design to allow bearings supporting the canal span decks to be jacked and adjusted as required.

Awards

SupplierValueDateStatus
Atkins £169,996 11 Feb 2020 Active

Notices

  1. 17 Feb 2020 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data